Electrical for a Restaurant Renovation in Toronto

Commercial · November 23, 2026

Restaurant kitchen line with a stainless-steel hood, exhaust ducts and stacked dishes on a pass-through counter

Photo: Maria Orlova / Pexels, Pexels License. Stock photo, not an Electro Group job.

A restaurant renovation is more than a new dining room. Electrically, it is a plan that has to carry the kitchen equipment, the hood and makeup air, the lighting in the dining room and bar, and enough service capacity to keep all of that running when the doors open.

If you are planning a restaurant renovation in Toronto and the GTA, this Guide walks through the electrical scope from the equipment list to the final inspection, and what to confirm about capacity before you sign a lease.

Start with the Equipment List and the Existing Supply

The first useful documents are a floor plan and a list of equipment: ranges, fryers, ovens, refrigeration, dishwashers, coffee machines, hot-holding equipment, and anything else with a nameplate. Those nameplates tell your electrician how much power each piece needs, and whether it needs its own circuit.

Part of the same visit is looking at what is already in the suite or the building: the panel, the feeder, and the service. A space that used to be a shop or an office can be far short of what a commercial kitchen will draw. That is a planning question, not something to discover after the equipment arrives.

If the suite itself is being built out as a tenant improvement, the landlord and tenant split is usually set by the lease. See Commercial Tenant Fit-Out Electrical: A Toronto Guide for that side of the work.

Kitchen Equipment Circuits

Most commercial cooking and refrigeration equipment is served by dedicated circuits, sized to the equipment. Sharing a general-purpose circuit across several kitchen loads is not how this work is planned.

The electrical plan also has to match where the equipment will actually sit. Changes after the hood, the counters and the tile are in place are much harder. Bring the equipment list and the kitchen drawings to the first conversation, even if some items are still out for quote.

Hood Exhaust and Makeup Air

A commercial kitchen hood removes a large volume of air. The air that replaces it — the makeup air — has to arrive in a way that does not starve the exhaust system or other equipment.

The Ontario Building Code requires makeup air facilities to be interlocked with the exhaust devices they serve so both operate together. With limited exceptions, commercial cooking equipment also has to be provided with a ventilation system designed, constructed and installed to conform to NFPA 96, the standard for ventilation control and fire protection of commercial cooking operations.

On the electrical side, that usually means coordinating the hood, the makeup air and the related controls with the mechanical and suppression trades. Other connections between cooking equipment, the hood and the fire-suppression system are part of the kitchen design. This Guide does not cover those kitchen-code details; they belong in the mechanical and suppression drawings, and in a later, more detailed kitchen Guide.

Service and Panel Capacity

A restaurant can ask more of a building's electrical service than the previous use did. Sometimes the existing panel or feeder is enough. Sometimes a new panel, a larger feeder or a utility service change is part of the work.

If a utility upgrade is in play in Toronto, that process is run by Toronto Hydro. See Toronto Hydro Service Upgrade: What Happens (and Who Does What).

This decision belongs in the plan before you sign a lease or lock in the kitchen layout. A load review against the equipment list is the reliable way to find out, rather than assuming the existing service will keep up.

Dining Room, Bar and Back-of-House Lighting

Outside the kitchen, the electrical plan usually covers:

  • Dining and bar lighting, including how each area is switched or dimmed
  • Back-of-house lighting in storage, offices and washrooms
  • Receptacles for point-of-sale equipment, servers' stations and guest use
  • Emergency and exit lighting where the building and the applicable codes require it
  • Pathways for data, music, security and other low-voltage work, coordinated with those trades

Signage and patio or storefront lighting, if they are part of the project, should be on the same list so they are not added as an afterthought.

What to Confirm Before You Sign a Lease

Capacity and access are easier to deal with before the lease is signed than after.

Checklist of restaurant electrical items to confirm before signing a lease in Toronto and the GTA

Diagram: Electro Group Ltd. Planning checklist only, not a code list or a quote.

Ask, and write down:

  • Whether the suite's existing electrical supply can support the planned kitchen and dining load
  • Who is responsible for a new panel, feeder or utility upgrade if one is needed
  • Access to the electrical room, shut-down rules and permitted work hours
  • Who files the ESA notification of work, and whether a municipal building permit is also required

Property managers coordinating access, shutdowns or base-building work may also find What Property Managers Should Ask a Commercial Electrician useful.

Permits and the Opening Date

ESA explains that almost all electrical work needs a notification of work (often called a permit) filed with the Electrical Safety Authority, and that a notification is not the same as a municipal building permit. A restaurant renovation may need both.

The person doing the electrical work files the notification. If you hire a Licensed Electrical Contractor, they file it.

We take out the ESA permit and arrange the inspection. When the work passes, ask for the ESA Certificate of Acceptance and keep it with your renovation records.

The sequence matters more than the speed:

  1. Planning. Review the drawings, the equipment list and the existing electrical supply.
  2. Permit. The licensed contractor files the ESA notification of work. Municipal permits, if required, follow the city's process.
  3. Rough-in. Branch circuit wiring, boxes, feeder work and equipment connections are coordinated while walls, ceilings and the kitchen line are still open.
  4. Rough-in review. Do not hide wiring behind finishes until the applicable ESA review has taken place.
  5. Equipment, fixtures and devices. Hood controls, equipment hook-ups, lighting and receptacles are completed with the other trades.
  6. Final review. ESA's guidance is to request the final inspection as soon as possible after the electrical installation is complete.

We don't promise durations. Inspection scheduling is set by ESA, and your opening date should leave room for it.

Electro Group Ltd. holds ESA Licence #7017939.

Next Steps

Planning a restaurant renovation in Toronto or the GTA?

Tell us the address, what the space will be used for, and your target opening date. If you have an equipment list and drawings, send those too. We'll review the electrical scope, take out the ESA permit and plan the work around your other trades.

A larger commercial or new-construction build-out is a close cousin of this work. See our commercial and new construction page for that kind of project.

Electro Group Ltd. · Toronto and the GTA · 289-814-7241 · ESA Licence #7017939

FAQ

Do I need an ESA permit for a restaurant renovation?
Almost all electrical work in Ontario needs an ESA notification of work. That is separate from a municipal building permit; you may need both. We take out the ESA permit and arrange the inspection for the work we do.

What should I confirm before I sign a lease?
Whether the existing electrical supply can support the planned kitchen and dining load, who would pay for a panel or service change if one is needed, and what access and work-hour rules apply. A load review against your equipment list is the reliable way to answer the capacity question.

Why do the hood and makeup air have to be interlocked?
The Ontario Building Code requires makeup air facilities to be interlocked with the exhaust devices they serve so both operate together. Your electrician coordinates those connections with the mechanical trade; this Guide does not cover the rest of the commercial kitchen ventilation code.

Can the ceiling or kitchen finishes be closed before the electrical inspection?
No. Plan the rough-in review before finishes hide the wiring. ESA reviews the work at the applicable stages of the installation.

Do you offer a free quote for restaurant renovation electrical work?
Yes, for planned work. Request a free quote.