Commercial Tenant Fit-Out Electrical: A Toronto Guide

Commercial · November 17, 2026

Vacant commercial unit under fit-out with an exposed ceiling, ductwork and open electrical cables

Photo: Kazi Khadem / Pexels, Pexels License

A commercial tenant fit-out is the work that turns a landlord's space into a room you can actually use: an office, a shop, a clinic or another business. Electrically, that can mean new lighting, new receptacles, a new panel or feeder, data pathways and connections for your equipment — all planned against the day you want to open.

If you are planning a tenant fit-out or tenant improvement in Toronto and the GTA, this Guide explains how the electrical side is usually split between the landlord and the tenant, what to line up before walls and ceilings close, and how the ESA permit fits the opening date.

What a Tenant Fit-Out Covers Electrically

In a typical commercial lease, the landlord provides the "base building": the structure, the main electrical service and the distribution that gets power to the floor or the suite. The tenant then fits out the unit for a specific use.

The exact split is not a code rule. It comes from the lease and from the landlord's tenant criteria (sometimes called a tenant manual or fit-out guide). Read those documents early, and share them with your electrician, so the quote matches what you are actually responsible for.

Landlord Base Building vs Tenant Scope

Every building is a little different, but a commercial fit-out often divides like this:

Typically in the landlord's base building

  • The building electrical service and the electrical room
  • Distribution to the floor, and often a disconnect or an empty panel location for the suite
  • Metering, if the lease calls for the unit to be metered on its own

Typically in the tenant's electrical scope

  • Branch circuits, lighting and receptacles inside the suite
  • Connections for specialty equipment, signage and furniture or workstation feeds
  • Pathways for data, security and other low-voltage work, coordinated with those trades
  • A new panel or feeder, if the base building supply is not enough for the planned use
Two-column diagram of a typical landlord base-building vs tenant electrical split on a commercial fit-out

Diagram: Electro Group Ltd. Typical practice only; the lease and the landlord's tenant criteria decide the actual scope.

If the suite needs more power than the building can already provide, the conversation may include a service or distribution change and the local utility. In Toronto, that process is run by Toronto Hydro. See Toronto Hydro Service Upgrades: What to Expect.

A larger build-out of a new or newly constructed commercial space is a close cousin of this work. See our commercial and new construction page for that kind of project.

Panels, Feeders and Metering

Part of the first site visit is looking at what is already in the suite or on the floor, and at what the new layout will add.

A new office, shop or clinic can need more circuits than a vacant unit was left with. Sometimes the existing panel or the feeder to the suite is enough. Sometimes a new panel, a larger feeder or a metering change is part of the tenant work. That decision belongs in the plan before lighting and furniture layouts are locked in.

Lighting, Power and Data

Once the scope is clear, the electrical plan usually covers:

  • Lighting. Ceiling and decorative lighting, emergency and exit lighting where the building and the code require it, and how each area is switched or dimmed.
  • Receptacles and equipment. Power where desks, displays, kitchenettes and specialty equipment will actually sit, including dedicated circuits where the equipment needs them.
  • Data and low voltage. Conduit or other pathways for data, access control and audiovisual work, so those trades are not cutting a finished ceiling later.

Bring a floor plan, an equipment list and the landlord's tenant criteria to that conversation. Changes after the ceiling is closed are much harder.

Permits, Inspections and the Opening Date

ESA explains that almost all electrical work needs a notification of work (often called a permit) filed with the Electrical Safety Authority, and that a notification is not the same as a municipal building permit. A fit-out may need both.

The person doing the electrical work files the notification. If you hire a Licensed Electrical Contractor, they file it. ESA also advises that if a general contractor is involved, you should confirm that a Licensed Electrical Contractor will do the electrical work. Our Guide on how to verify a licensed electrician in Ontario shows how to check.

We take out the ESA permit and arrange the inspection. When the work passes, ask for the ESA Certificate of Acceptance and keep it with your fit-out records.

The sequence matters more than the speed:

  1. Planning. Review the lease and tenant criteria, the drawings, the equipment list and the existing electrical supply.
  2. Permit. The licensed contractor files the ESA notification of work. Municipal permits, if required, follow the city's process.
  3. Rough-in. Branch circuit wiring, boxes and feeder work go in while walls and ceilings are still open.
  4. Rough-in review. Do not hide wiring behind drywall or ceiling tile until the applicable ESA review has taken place.
  5. Finishes, devices and fixtures. Other trades close up; then receptacles, switches, lights and equipment connections are completed.
  6. Final review. ESA's guidance is to request the final inspection as soon as possible after the electrical installation is complete.

We don't promise durations. Inspection scheduling is set by ESA, and your opening date should leave room for it. Property managers coordinating access, after-hours work or shutdowns may also find What Property Managers Should Ask a Commercial Electrician useful.

A Planning Checklist for Tenants and Project Managers

Bring these to the first conversation with your electrician:

  • The lease and the landlord's tenant criteria or fit-out guide
  • Architectural and, if you have them, electrical drawings
  • A list of equipment, including nameplate information where you have it
  • Your target opening date and any landlord approval deadlines
  • Access rules, work-hour limits and who holds keys or fobs
  • Whether the unit will have its own meter

Electro Group Ltd. holds ESA Licence #7017939.

Next Steps

Planning a commercial tenant fit-out in Toronto or the GTA?

Tell us the address, the building and unit, what the space will be used for, and your target opening date. We'll review the electrical scope, take out the ESA permit and plan the work around your other trades.

Electro Group Ltd. · Toronto and the GTA · 289-814-7241 · ESA Licence #7017939

FAQ

Who is responsible for the electrical work in a commercial tenant fit-out?
It depends on the lease and the landlord's tenant criteria. The landlord often provides the base building supply to the suite; the tenant often looks after lighting, receptacles, equipment connections and any new panel or feeder the use requires. Your electrician should read those documents before quoting.

Do I need an ESA permit for a commercial fit-out?
Almost all electrical work in Ontario needs an ESA notification of work. That is separate from a municipal building permit; you may need both. We take out the ESA permit and arrange the inspection for the work we do.

Can the ceiling be closed before the electrical inspection?
No. Plan the rough-in review before drywall or ceiling tile hides the wiring. ESA reviews the work at the applicable stages of the installation.

What if the suite does not have enough power for my use?
That is a planning question, not something to discover after the furniture arrives. It may mean a new panel or feeder, and in some cases a utility service change. See Toronto Hydro Service Upgrades: What to Expect if a utility upgrade is in play.

Do you offer a free quote for commercial fit-out work?
Yes, for planned work. Request a free quote.